Follow up the day you send the estimate, again two days later, and then on a slowing schedule until you get a clear yes or no: day 0, 2, 5, 10, 21 and 45. Give each message one job: confirm it arrived, answer a common worry, offer a smaller option, or close the loop.
A homeowner who has gone quiet usually hasn't said no. They are comparing quotes, waiting on a partner, unsure about financing, or don't know how to turn you down. A calm, scheduled follow-up gives them an easy way to answer.
Why estimates go quiet
You walked the job, measured, priced it and sent it. Then nothing. It's tempting to assume the price was wrong. Often it's something smaller:
- They're waiting on someone else: a partner, a landlord, an insurance adjuster, a bank.
- They have two or three quotes and haven't sat down to compare them.
- Something in the quote worried them (timing, warranty, the deposit) and they didn't want to ask.
- They chose someone else and feel awkward telling you. HomeAdvisor's own guidance to pros says homeowners often find it easier to go silent than to turn a contractor down.
Most contractors don't lose these jobs on skill or price. They lose them because nobody is responsible for the follow-up and nobody tracks which quotes are still open. Industry write-ups keep coming back to the same point, and the bar is low: trade journalists have described homeowners chasing contractors for estimates that were promised and never sent.
The schedule
| Day | How | The message's one job |
|---|---|---|
| 0 | Email with the estimate, plus a text | Confirm it arrived and invite questions |
| 2 | Text | A short, friendly check-in |
| 5 | Answer the usual worries: timing, warranty, financing, past work | |
| 10 | Phone call for big jobs, text for small ones | Find out where they are and what's in the way |
| 21 | Text | Offer to adjust: a smaller scope, a later start, a payment option |
| 45 | Close the loop politely and leave the door open |
Stop the moment they answer. A yes goes to scheduling. A no gets a thank-you and one question about why. A "not yet" gets a date to check back.
Messages you can copy
Hi [Name], it's [Your name] from [Company]. I've just emailed your estimate for the roof replacement. Have a look when you get a minute, and text me here if anything doesn't make sense.
Hi [Name], [Your name] from [Company] again. Did the estimate come through OK? Happy to walk you through it on a quick call if that's easier.
Subject: A few things people usually ask about your roof estimate Hi [Name], When people are weighing up a roof replacement, the same questions come up: how long it takes, what the warranty covers, whether we can work with your insurance claim, and what happens if the weather turns. I've answered each one below, with photos from two similar jobs nearby. [Your answers and photos] If something else is holding you back, just reply. No pressure either way. [Your name]
Hi [Name], still thinking it over? If the timing or the total isn't right, I can look at a smaller scope or a later start date. Just say the word.
Hi [Name], I'll close out your estimate for now so I'm not filling up your inbox. If the project comes back up, reply to this and I'll pick it straight back up. Thanks again for having us out.
The last message often gets the most replies. It takes the pressure off and gives people a simple way to say "we went with someone else" or "actually, can we talk next month?". Either answer is worth more than silence.
When to call instead of text
Text is fine for small jobs and quick check-ins. For a roof replacement, a new HVAC system or a kitchen remodel, the day 10 touch should be a phone call from the person who walked the job. Big decisions stall on questions that are hard to type: "Can we split it into two phases?", "Is the cheaper quote missing something?". A five minute call answers them.
If you only change one thing, make the day 10 call. It's the step most crews skip.
Notes by trade
- Roofing: insurance claims move on the adjuster's timetable. Ask where the claim is, and set your follow-up around it rather than the calendar.
- HVAC replacements: financing questions stall more replacements than price does. Put the monthly payment option in the day 5 email.
- Remodeling: couples decide together and change their minds about scope. Offer a short design call, and send a revised quote quickly when they ask.
Track it, or it won't happen
A follow-up schedule that lives in someone's head stops the first busy week. Keep one list of every open estimate with five columns: customer, amount, date sent, last touch, and status (open, won, lost, and the reason if you know it).
Review it once a week. Two numbers tell you most of what you need: how many estimates are still open after 10 days, and the reasons on the lost ones. If "never heard back" is the most common reason, the follow-up is the fix, not the price.
Field software like Jobber, Housecall Pro or JobNimbus can store estimates and reminders. What usually goes missing is someone owning the schedule. That's the gap an automated follow-up fills.
What not to do
- Don't text every day. It's the fastest way to turn a maybe into a no.
- Don't send "just checking in" with nothing new. Each message should add something: an answer, a photo, an option.
- Don't drop your price in the first follow-up. If price is the problem, ask what they were comparing first. The other quote may not include the same work.
- Don't stop after one try. One message and silence isn't a no.
Common questions
How many times should I follow up on an estimate?
Five or six times over about six weeks is reasonable for a big job, as long as each message has a purpose and you stop the moment they answer. For small jobs, two or three touches over a week is enough.
Is it better to text or call after sending an estimate?
Text for the quick check-ins, call for the big decisions. A phone call from the person who walked the job is the single most useful follow-up on a large estimate.
What do I say when the homeowner says my price is too high?
Ask what they're comparing it to. Often the other quote leaves out work, uses different materials or a shorter warranty. If the comparison is fair, offer a smaller scope or a payment option before you cut the price.
Should I follow up on bids I lost?
Yes, once. A short, polite note asking why you weren't chosen gives you information you can't get any other way, and some homeowners come back when the cheaper contractor falls through.
